K
k27
Guest
Still in process of building, though...
I bought it in a very poor condition but little by little it is getting back to what it should look like... at least in my eyes...
A lot of things were not stock when i got it, so I had really hard time with this boy...
Rebuilded (new):
- front forks - front suspension
- rear suspension
- new paint job
Replaced:
- spark plugs
- battery
- brake pads - front and rear
- motor oil & oil filter
- thermostat
- coolant
- air filter (K&N)
- clutch (complete set)
- chain (DID Gold)
- gear wheels (fromt and rear)
Upgrades:
- wheels from R1
- tires (rear 190/50/17)
- custom rear brake disk with custom flange
- custom handlebars
- custom headlights & blinkers
- custom taillights & blinkers
- custom tail and seats
- akrapovic muffler
- bike is lowered 2 cm. front and 4 cm. rear
Just a small part of what of all I've done to the bike to bring it back to life... but I am happy with the result. There are a lot of things still to be done like handlebar damper & custom stand, jet kit, etc, but I hope to finish it in a couple of months and be ready for the spring season.
I bought it in a very poor condition but little by little it is getting back to what it should look like... at least in my eyes...
A lot of things were not stock when i got it, so I had really hard time with this boy...
Rebuilded (new):
- front forks - front suspension
- rear suspension
- new paint job
Replaced:
- spark plugs
- battery
- brake pads - front and rear
- motor oil & oil filter
- thermostat
- coolant
- air filter (K&N)
- clutch (complete set)
- chain (DID Gold)
- gear wheels (fromt and rear)
Upgrades:
- wheels from R1
- tires (rear 190/50/17)
- custom rear brake disk with custom flange
- custom handlebars
- custom headlights & blinkers
- custom taillights & blinkers
- custom tail and seats
- akrapovic muffler
- bike is lowered 2 cm. front and 4 cm. rear
Just a small part of what of all I've done to the bike to bring it back to life... but I am happy with the result. There are a lot of things still to be done like handlebar damper & custom stand, jet kit, etc, but I hope to finish it in a couple of months and be ready for the spring season.