drclarksmith
Well-Known Member
I finally modded the airbox, installed the BMC, installed the throttle body plates, blocked off the air induction system, intalled the Fuel cutoff eliminator, gutted the cat, and finally re-mapped her for all of the following. I changed the oil/filter and had the Bridgestone BT016's put on a few weeks ago too.
Can't wait to go ride on Laborday weekend!
OK now I'm no motorcycle mechanic, nor did I have the best tools for the job (especially gutting the cat) I used a screwdriver, but I was able to do all of this in about 7-8 hours.
I was wondering if that is a decent amount of time to do all that, or was i EXTREMELY slow?
Let me know your opinions.
It was raining hard yesterday so, even though I had to ride it, wasn't able to get on it really.
Can't wait to go ride on Laborday weekend!
OK now I'm no motorcycle mechanic, nor did I have the best tools for the job (especially gutting the cat) I used a screwdriver, but I was able to do all of this in about 7-8 hours.
I was wondering if that is a decent amount of time to do all that, or was i EXTREMELY slow?
Let me know your opinions.
It was raining hard yesterday so, even though I had to ride it, wasn't able to get on it really.